9-level parking structure of cast in place concrete construction with a moment frame and shear wall lateral system in high seismic zone.
Engineer: Jon Talley
9-level parking structure of cast in place concrete construction with a moment frame and shear wall lateral system in high seismic zone.
Engineer: Jon Talley